Learn More From
Frequently Asked Questions
We cover Lancashire, Greater Manchester, Merseyside and Cheshire, including surrounding towns and areas. If your location falls outside these areas, please contact us to discuss availability.
Most concrete bases are completed within 1–2 days, depending on size, access and ground conditions. The concrete will usually be safe to walk on after 24–48 hours, with full strength achieved over time.
Yes, proper ground preparation is essential for a long-lasting base. We handle all excavation, install a solid hardcore sub-base and compact it correctly to prevent movement or sinking in the future.
Yes, we install concrete bases for garages, sheds, summer houses, garden rooms and other outbuildings. Each base is tailored to suit the size, weight and intended use of the building.
Yes, we can remove and dispose of old concrete slabs, turf and soil as part of the job, leaving your site clean and tidy once work is complete.
You can get a free, no-obligation quote by contacting us with the approximate size of the base and a brief description of the site. We will also arrange a site visit if needed.
